Utilize este identificador para referenciar este registo: http://hdl.handle.net/11067/6815
Registo completo
Campo DCValorIdioma
dc.contributor.advisorRibeiro, Ana Cecília Dias Ferreira-
dc.contributor.authorSilva, Marco Alexandre Tavares da-
dc.date.accessioned2023-02-28T15:06:57Z-
dc.date.available2023-02-28T15:06:57Z-
dc.date.issued2022-
dc.identifier.urihttp://hdl.handle.net/11067/6815-
dc.descriptionMestrado em Engenharia e Gestão Industrialpt_PT
dc.descriptionExame público realizado em 23 de Janeiro de 2023pt_PT
dc.description.abstractO presente projeto foi desenvolvido no âmbito do Mestrado em Engenharia e Gestão Industrial da Universidade Lusíada-Norte Campus de Vila Nova de Famalicão. Foi realizado em parceria com a Divisão Plásticos do Grupo Simoldes, empresa produtora de componentes plásticos para a indústria automóvel. O principal objetivo consistiu em verificar se a capacidade instalada da empresa é suficiente para assumir um incremento de fornecimento previsto para um dos seus clientes. Nesse sentido, realizou-se uma revisão da literatura para identificar as melhores práticas relativas à temática em estudo. Abordaram-se temas como a importância da CA no desempenho empresarial, assim como a relevância da filosofia Lean para o aumento da eficiência dos processos. Na análise da realidade da empresa em estudo, verificou-se a falta de capacidade logística para fazer face ao incremento previsto do volume de fornecimento. Recolheu-se informação sobre os volumes a fornecer e definiu-se uma proposta de localização para um novo armazém, visando a minimização dos custos de operação. Após simulação e análise de cenários, selecionou-se a localização com menor impacto económico que propõe a existência do novo armazém entre Valladolid e Salamanca. Este cenário, com custo total de transporte de 2 428 890,2€/ano, oferece uma economia expectável de 7 117,00€/ano e 186 502,80€/ano em comparação com o cenário da proximidade da fábrica Simoldes e das instalações do cliente Stellantis Zaragoza, respetivamente. Elaborou-se ainda uma proposta de layout do novo armazém, considerando os volumes a movimentar, as dimensões de embalagens e as disposições legais vigentes. Realizou-se uma análise ABC para atribuir as localizações dos produtos de modo a reduzir as distâncias a percorrer. Consideraram-se as áreas de suporte à operação de acordo com os pressupostos da empresa e estimou-se a necessidade de 2070 m2. Com base nos tempos de operação e na quantidade de camiões a rececionar e expedir, apurou-se a necessidade de 2 recursos humanos por turno e 2 equipamentos de handling. Identificaram-se ainda tópicos a desenvolver no futuro passíveis de afinarem a proposta apresentada. Palavras-chave: Cadeia de abastecimento, logística, Factor Rating Model, Modelo do centro gravítico, Análise ABC.pt_PT
dc.description.abstractThis project was developed within the scope of the Master’s Degree in Industrial Engineering and Management from Universidade Lusíada-Norte, Campus Vila Nova de Famalicão. It was carried out in partnership with the Plastics Division of Grupo Simoldes, a company that produces plastic components for the automotive industry. The main purpose was to verify if the company's installed capacity was sufficient to deal with an expected supply increase for one of its customers. In this sense, a literature review was carried out to identify the best practices related to the subject under study. Topics such as the importance of the Supply Chain in business performance were addressed, as well as the relevance of Lean philosophy to increase the efficiency of processes. During the analysis, it was identified that the company’s logistics capacity was not sufficient to face the expected increase of customers demands. Information was collected on the volumes to be supplied and a proposal for a new warehouse was defined. The warehouse location was calculated using the Center Gravity Model and the Factor Rating Model, seeking operating costs reduction. After simulating and analysing several scenarios, the proposal with the lowest economic impact was selected, setting the new warehouse between Valladolid and Salamanca. This scenario, with a total transport cost of €2,428,890.2/year, offers savings of €7,117.00/year and €186,502.80/year compared to the most extreme locations, close to Simoldes factory and customer's Stellantis Zaragoza facilities, respectively. A proposal for the new warehouse layout was also drawn up, considering the volumes to be handled, packaging dimensions and actual legal norms. An ABC analysis was carried out to assign the locations of the products in order to reduce the distances to travel. The operation support areas were considered according to the company's assumptions and the need for 2070 m2 was estimated. Based on operating times and the number of trucks to be received and shipped, the need for 2 human resources per shift and 2 handling equipments was determined. Topics that could improve the presented proposal were identified and recommended to be developed in the future. Key words: Supply chain, Logistics, Factor Rating Model, Center-of-gravity approach, ABC analysis.en
dc.language.isoporpt_PT
dc.rightsopenAccesspt_PT
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0/pt_PT
dc.subjectGestão industrialpt_PT
dc.subjectLogísticapt_PT
dc.subjectCadeia de abastecimentopt_PT
dc.titleAnálise e melhoria das estratégias de abastecimento de uma empresa de componentes para automóveispt_PT
dc.typemasterThesispt_PT
degois.publication.locationVila Nova de Famalicãopt_PT
dc.peerreviewednopt_PT
dc.identifier.tid203189426-
Aparece nas colecções:[ULF-FET] Dissertações

Ficheiros deste registo:
Ficheiro Descrição TamanhoFormato 
megi_marco silva_dissertacao.pdfDissertação3,96 MBAdobe PDFThumbnail
Ver/Abrir


FacebookTwitterDeliciousLinkedInDiggGoogle BookmarksMySpace
Formato BibTex mendeley Endnote Logotipo do DeGóis Logotipo do Orcid 

Este registo está protegido por Licença Creative Commons Creative Commons